Synergistics Solutions

Ontario Hydro Problem Solving Division

"We CANDU what others CANNOT!"

 

Who we are: A team of design engineers and scientists at Ontario Hydro

Priciple Task: To analyze a PRESSURE TUBE RUPTURE at Pickering A

Problem Statement (as given): PRESSURE TUBE RUPTURE resulted in LOSS OF COOLANT ACCIDENT (LOCA)

 

Main Goals

To brief media

To brief employees

To brief neighbours

To fix current problems

To guide future design decisions

 

To achieve the above Goals the following Tasks must be completed:

 

General

(1) Describe the Pickering A NGS

(2) Relate it's design, capacity and features in general to other CANDU's

(3) Explain the importance to power generation in Canada i.e state what it's non-contribution would result in

(4) Describe the accident, literally and using a event timeline - specifically LOCA Event Timeline

(5) Prepare a Media Pack (a brief description of the plant w/info regarding the actual rupture and its implications for people)

(6) Obligatory statement to employees, whether to confirm or alay their fears - depending on findings

(7) Goodwill flyer (statement to the neighbours)

 

Technical

(8) Situation Analysis (SA) at the time of the event (analyze the operator's situation at time of failure)

(9) Analysis of the problem(s) producing the fault (PA)

(10) Analysis of how the operators corrected the fault (DA) and comment

(11) Analysis of how to prevent future faults (PPA)

 

Management

(12) Produce a group GANTT Chart outlining strategy for Pressure Tube Inspections @ Units 1 - 8

(13) Reactors built with limited lifetime, so develop suitable strategy for inspecting all pressure tubes

 

REMEMBER TO REFERENCE ALL INFORMATION!!!